- The 3CC System was incorporated into the podium deck waterproofing.
- The 3CC System is incorporated into the swimming pool and pool deck.
- The 3CC System was incorporated into the basement retaining wall (3 level) & cistern tank waterproofing.
- The 3CC System is incorporated to the rehabilitation of the pier.
- The EDC System was incorporated into the mat foundation, basement walls, roofdeck, and in- ground water tank waterproofing.
The 3CC System is incorporated into the retaining wall and slab
The 3CC System is incorporated into the rehabilitation of the cistern tank.
- The 3CC System was incorporated into the sewage treatment plant waterproofing.
- The 3CC System is incorporated into the in ground swimming pool.
- The EDC System was incorporated into the suspended swimming pool slab and walls waterproofing. The 3CC System was incorporated into the waterproofing of cistern tank base slab and wall.
The Integral Waterproofing System is incorporated into Suspended slab and swimming pool.
- The 3CC System was incorporated into the intake tank wall that is 6.5 meters below sea level waterproofing.
- The 3CC System was incorporated into the base slab and walls of the Waste Water Treatment Plant waterproofing.
- The 3CC System is incorporated into the plaza deck.
- The EDC and 3CC System was incorporated into the basement retaining wall (4 level), sump pit and cistern tank waterproofing.
- The EDC System is incorporated into the roof deck.
- The 3CC System is incorporated into the on-ground swimming pool.
The 3CC System is incorporated into the swimming pool.
The EDC System was incorporated into the sugar room area to prevent sugar acid from penetrating.